Week 12 Progress Pics–Staircase Edition

I received news that the temporary stairs were installed! Naturally, I stopped by the house to see the progress. And this time, I took plenty of pictures of the 2nd and 3rd floors. Demolition is done. Framing is almost complete. Electrical, plumbing and HVAC rough-in begins. It’s starting to look like home.

First Floor

IMG_0853 IMG_0854 IMG_0839

Entrance from the vestibule. The new location of the staircase to the second floor. Vertical wood braces are temporary as the structure is secured.

 

IMG_0842 IMG_0843

From the living room looking into the dining room (with the kitchen in background). Vertical wood braces are temporary.

 

IMG_0856

Looking through the hallway from the dining room towards the kitchen. Hallway will contain the powder room to the right and coat closet along with basement access to the left. Eat-in kitchen will be past the hallway. Door to garage in the distant right.

 

IMG_0841

In the kitchen and looking back into the dining room and living room. Temporary braces make the pass-through seem smaller.

 

Second Floor 

IMG_0821 IMG_0817 IMG_0857

Stairs coming up to the second floor hallway, followed by 2 steps to the lower portion of the second floor, which leads into the back bedroom and full bathroom (not pictured). The bathroom has completely new floor joists and an interior wall – they were necessary when the old staircase was eliminated.

 

IMG_0858 IMG_0860 IMG_0859

The back bedroom regained ceiling height by removing the existing low ceiling and installing the new ceiling to the roof’s pitch. This room was originally planned to be a guest bedroom but may become the media room.

 

IMG_0862 IMG_0871 IMG_0869

The middle bedroom has been framed out and the interior wall with the door has been moved in to accommodate the new staircase and hallway (now each 3 feet to comply with code). This room is perfect as a study.

 

IMG_0863 IMG_0864

From the hallway, walk past the middle bedroom and to the front bedroom. The entrance needed to be bumped-in to accommodate the new staircase to the third floor – it flipped direction and became less angled.

 

IMG_0865 IMG_0824 IMG_0867

The front bedroom was originally planned as the media room but might become the guest bedroom. It faces south and gets plenty of sunlight all afternoon. It’s also across the street from a garden park so there are no neighbors across the way.

 

Third Floor 

IMG_0826 IMG_0874 IMG_0827

Head up the new stairs to a (now boarded) door out to the deck. A hallway leads to an entrance for the master bathroom to the left and bedroom straight ahead .

 

IMG_0876 IMG_0877 IMG_0878

Vanity on inside wall, toilet and shower stall to the right and laundry room straight ahead.

 

IMG_0832 IMG_0833

Entrance of the master bedroom from the hallway. Side wall for bed.

 

IMG_0831 IMG_0834 IMG_0835

Entrance of the master bedroom again and side wall for the closet space. We regained ceiling height by removing the existing ceiling to expose the ceiling joists (treatment TBD).

This entry was posted in "Before", Demolition, Dining Room, Entrance, Floor Layout, Framing, Kitchen, Master Bathroom, Pictures, Powder Room, Staircase, Vestibule. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s